Energy Rehabilitation
The perfect solution for your community of residents: more thermal comfort, more savings and with renewable energy
-
We design a tailor-made solution for all the residents: no noise and no nuisance
-
We manage the available subsidies, advancing the pre-approved grant!*
-
You will increase the value of your home by 20% to 30%
Energy Rehabilitation
The perfect solution for your community of residents: more thermal comfort, more savings and with renewable energy
-
We design a tailor-made solution for all the residents: no noise and no nuisance
-
We manage the available subsidies, advancing the pre-approved grant!*
-
You will increase the value of your home by 20% to 30%
Discover the advantages of this comprehensive solution
Your home will consume much less energy, this way taking care of the planet and your wallet






With a more efficient home, reduce your energy bills - and save!
Achieve greater thermal comfort, while using less energy.
Increase the value of your home by 20%-30%.
Say goodbye to gas and diesel! And minimise your electricity consumption.
Reduce your CO2 emissions, go for renewable energy.
Improve your energy rating and earn money for that.






Make the most of our preferred financing terms and conditions.
Discover our direct discounts in special energy rates for your home’s energy refurbishment.
Benefit from the existing tax deductions.
Forget about all the actions with Iberdrola in charge of all the actions, with Iberdrola Guarantee.
Therefore, the the maintenance of your installations for the first year is free.
What does it include?
Why with Iberdrola?
We help you to bring your community of residents to its best version.
How much could it cost me?
Each homeowners' association is unique and requires a customised study. Here is an example of refurbishment budget as a reference, taking into account one of the country’s existing climate areas.
Example of refurbishment in a building built in 1976, 186 homes, climate area type C
Price per home (incl. VAT)
15.352 €
Estimated price per home*
243 €/month
Actions required to use more than 60% renewable energy:
In a building with a flat roof and a collective gas boiler for heating.
External façade insulation with SATE system.
Roof insulation with filtron-type stone.
Thermal installation of the building. Aerothermal heat pump for heating.
Installation of PV self consumption.
Example of refurbishment in a building built in 1976
Simulation of an indicative quotation for a building with 186 homes, built in 1976 in climate area type C.
Amount to be paid by the association*
4.529.395 €
Actions required to use more than 60% renewable energy:
In a building with a flat roof and a collective gas boiler for heating.
External façade insulation with SATE system.
Roof insulation with filtron-type stone.
Thermal installation of the building. Aerothermal heat pump for heating.
Installation of PV self consumption.
*Examples of an indicative quotation for a building with 186 homes, built in 1976. Including VAT. If your home does not match these parameters, contact us without obligation for a customised study for your home.






Any questions?
Here are some of the most frequently asked questions
¿Qué es?
Benefits such as elimination of dependence on fossil fuels, a 100% electric solution, energy savings from day one, improved thermal comfort and total self-consumption.
Yes, property appreciation is estimated to increase by 25% after energy rehabilitation.
Subsidy and payment
Generally three months from application, although it can take up to five months.
No. If the Administration grants a lower subsidy percentage than the one specified in the offer, Iberdrola must inform the CCPP, offering the CCPP the possibility to stop or continue with the Rehabilitation. Should the CCPP wish to proceed, it will do so under the new parameters of the subsidy awarded; otherwise, the commitment is considered to be terminated without incurring any costs for the CCPP.
No. If, once the work has been carried out, the Administration informs Iberdrola that the work does not comply with the project drawn up and therefore does not recognise the percentage of the grant initially awarded, Iberdrola assumes the difference. In other words, the CCPP will not be affected by this variation in the amount finally paid.
Yes, we collaborate with most financial institutions and would make available to the CCPP the one that best fits their requirements.
If, once the project is completed, the project shows that the initial quotation deviates by more than the 10% reflected in the offer, Iberdrola will not pass on the cost, offering the CCPP the possibility to stop or continue with the rehabilitation. If it wishes to proceed, the CCPP will pay the new adjusted financial proposal.
The CCPP will have to pay the cost of the project and other expenses that may have been incurred so far.
Installation
The possibilities are: SATE system, ventilated façade or blown cavity insulation. Once the needs of the building have been assessed, and with the approval of the CCPP, the most suitable solution will be implemented, provided that it meets the maximum requirements for obtaining the subsidy.